Case Studies

Passive Fire Protection Projects Across the UK

At Bee Fire Protection Ltd, we deliver compliant passive fire protection solutions across a wide range of sectors, building types, and risk environments.

Based in Hull and operating nationwide, our team works on projects of all sizes — from live refurbishments and complex new builds to highly regulated and operational environments. The case studies below provide a snapshot of our experience delivering fire stopping, compartmentation, intumescent coatings, inspections, and asset management across the UK.

Our Passive Fire Protection Projects

Each project listed below links to a dedicated case study page with more detailed information on the scope of works, challenges, and solutions delivered.

RAF Wattisham Barracks – Single Living Accommodation (SLA)

Defence / Military

Services Provided: Fire Stopping

We were appointed to deliver passive fire protection works at RAF Wattisham Barracks as part of a major modular construction programme providing new Single Living Accommodation (SLA) bedspaces.

ABP Hull Border Control Post – Fire Curtain Installation

Infrastructure/Ports | Hull

Services Provided: Fire Curtains (Vertical Barriers)

The project required the installation of robust vertical fire barriers capable of withstanding significant air volume loads within a large plant room environment, while maintaining effective fire compartmentation throughout the building’s lifecycle.

LGS Washington Metal Works – Steel Column Encasements

Industrial/Manufacturing | Washington

Services Provided: Steel Column Encasements

The project required compliant structural steel encasements to the fire boundaries of the new building, supporting fire resistance requirements while aligning with the speed and efficiency associated with LGS construction.

The Light Leeds – Unit 15 Retail Unit

Retail | Leeds

Services Provided: Intumescent Coatings

The project required a revised fire protection approach that would allow the existing structural steelwork to remain exposed as part of the store’s finished aesthetic, while still achieving compliant fire resistance performance.

University of Hull – DAIM IT Teaching Space Building

Education | Hull

Services Provided: Fire Stopping, Acoustic Sealing

We were appointed to deliver passive fire protection works to all wall and floor penetrations within the fire compartmentation of the University of Hull’s new DAIM IT Teaching Space Building. The project required close coordination and delivery to a tight programme to ensure the building opened in time for the January 2023 semester.

Budgens Supermarket Refurbishment – Holt

Retail | Holt

Services Provided: Fire Curtains, Fire Partitions, Fire Stopping

Following previous fire damage, we were appointed to install fire protection systems within an existing Budgens supermarket undergoing refurbishment. Works included vertical fire barriers, fire partitions, associated boarding, and fire stopping measures to restore compliant compartmentation.

Audi Harrogate – Structural Steel Encasement

Commercial / Automotive | Harrogate

Services Provided: Structural Steel Encasement

We provided fire protection encasement to the structural columns and beams of Audi Harrogate’s new cosmetic repair facility. The works ensured the required fire resistance period was achieved in line with the project’s fire boundary conditions.

Residential Care Home – Coventry

Residential Care | Coventry

Services Provided: Intumescent Painting

We were appointed to apply reactive intumescent coatings to all structural load-bearing beams within a residential care facility. The project required careful coordination, detailed quality assurance, and precise application to ensure full protection was achieved despite clearance constraints.

Capitol Park – Office & Warehouse Space, Barnsley

Commercial / Industrial | Barnsley

Services Provided: Fire Partitions, Compartmentation

We were appointed by the end user to provide fire-rated partition walls and compartmentation works to separate warehouse operations from occupied office and welfare areas, ensuring compliance with Building Regulations Part B means of escape requirements.

RNLI Tower Lifeboat Station – King George V Dock

Infrastructure / Marine | Hull

Services Provided: Fire Stopping, Asset Labelling & Registers

Working within an operational marine environment, we delivered fire stopping measures to all wall and floor penetrations. Each penetration was labelled at the time of installation, with full product and system information logged into the fire asset register for lifecycle management.

Why Our Project Experience Matters

Delivering passive fire protection within live, operational, and regulated environments requires more than installation expertise alone.

Our experience allows us to:

  • Work safely within occupied and high-risk buildings

  • Deliver to tight programmes and critical deadlines

  • Maintain compliance and traceability throughout projects

  • Coordinate effectively with contractors and stakeholders

  • Support long-term fire safety through inspections and maintenance

This makes us a trusted partner for one-off projects, repeat works, and framework agreements.

👉 Find out why clients choose Bee Fire Protection

Discuss Your Project With Us

If you’re planning a project and would like to understand how our experience could support your fire safety requirements, our team is here to help.

Contact

01482 236789

Address

Unit 38, Craven Park Training and Enterprise Centre, Poorhouse Lane,
Hull, HU9 5HE

Contact Bee Fire Protection today