At Bee Fire Protection Ltd, we were appointed to deliver passive fire protection works at the Audi Harrogate site as part of the construction of a new cosmetic repair facility.

The project required fire protection encasement to structural steel columns and beams to achieve the specified fire resistance period and ensure compliance with the building’s fire strategy.

Project Overview

  • Client: Audi Harrogate

  • Project: Cosmetic Repair Facility

  • Sector: Commercial / Automotive

  • Location: Harrogate

  • Services Provided: Structural Steel Encasement

The works formed a key part of the building’s fire protection measures, ensuring structural stability and integrity in the event of a fire.

Project Requirements

The new facility required:

  • Fire protection to all relevant structural steel elements

  • Achievement of a one-hour fire resistance period

  • Solutions compliant with Building Regulations and fire strategy requirements

  • Accurate installation within a commercial construction programme

Ensuring the correct fire protection solution was specified and installed was essential to meet both safety and regulatory expectations.

Challenges & Considerations

Structural steel encasement requires careful planning and attention to detail to ensure full protection is achieved.

Key considerations on this project included:

  • Correct encasement of columns and beams to achieve the required fire rating

  • Maintaining continuity of fire protection across junctions and interfaces

  • Coordinating works with other construction activities on site

  • Ensuring installations met tested system requirements

The encasement solution needed to provide reliable protection without impacting the operational use of the facility.

Our Solution

Our experienced delivery teams installed a compliant structural steel encasement system to protect all specified columns and beams.

Our works included:

  • Installation of fire-rated encasement systems to structural steel

  • Careful detailing to ensure full coverage and continuity

  • Use of tested and approved passive fire protection systems

  • Coordination with the wider project team to meet programme requirements

All works were delivered with a strong focus on quality and compliance.

Quality Assurance & Compliance

Structural steel fire protection must be installed correctly to perform as tested in a fire situation.

Our quality assurance measures included:

  • Installation in line with tested fire protection systems

  • Verification of correct materials and fixing methods

  • Inspection of completed encasement works

  • Supporting documentation for fire safety records

This ensured the completed installation met the required one-hour fire resistance performance.

Project Outcome

The completed works provided compliant fire protection to the structural steel elements of the new facility, supporting safe operation and regulatory compliance.

The outcome delivered:

  • Protected structural integrity in the event of fire

  • Compliance with fire strategy and Building Regulations

  • Confidence for the client that fire protection requirements were met

Commercial & Automotive Sector Experience

This project demonstrates our experience delivering passive fire protection within commercial and automotive environments, where structural protection and compliance are critical.

👉 View the sectors we work in

👉 Explore our Fire Walls & Partitions services

👉 Explore our Intumescent Painting services

👉 See More Case Studies

Discuss Your Project With Us

If your project requires compliant structural steel fire protection, our team is here to help.

Contact

01482 236789

Address

Unit 38, Craven Park Training and Enterprise Centre, Poorhouse Lane,
Hull, HU9 5HE

Contact Bee Fire Protection today