Capitol Park – Office & Warehouse Space, Barnsley

Passive Fire Compartmentation for a Commercial & Industrial Development

At Bee Fire Protection Ltd, we were appointed to deliver passive fire protection works at the Capitol Park development in Barnsley, supporting the creation of compliant office and welfare spaces within an operational warehouse environment.

The project required fire-rated compartmentation to separate occupied office areas from warehouse operations, ensuring compliance with Building Regulations Part B and means of escape requirements.

Project Overview

  • Client: End User

  • Project: Office & Warehouse Adaptation

  • Sector: Commercial / Industrial

  • Location: Barnsley

  • Services Provided: Fire-Rated Partitions, Compartmentation

The works formed part of a wider adaptation of the premises, allowing the warehouse to remain operational while introducing new office and welfare facilities.

Project Requirements

The project required:

  • Separation of warehouse and office environments

  • Installation of compliant fire-rated partition walls

  • Protection of escape routes and occupied spaces

  • Compliance with Building Regulations Part B

  • Solutions suitable for an operational industrial setting

Ensuring continuity of fire compartmentation was essential to protect occupants and allow safe use of the adapted spaces.

Challenges & Considerations

Delivering compartmentation within a mixed-use industrial building required careful coordination and attention to detail.

Key considerations included:

  • Working within an active warehouse environment

  • Ensuring fire resistance at junctions and interfaces

  • Integrating new partitions with existing building elements

  • Maintaining compliance without disrupting operations

The solutions needed to be robust, practical, and compliant with the building’s fire strategy.

Our Solution

Our team delivered a compliant compartmentation solution tailored to the layout and operational needs of the premises.

Our works included:

  • Installation of a jumbo stud fire-rated partition wall

  • Fire-rated boarding systems to achieve the required fire resistance

  • Protection head detailing to maintain compartment integrity

  • Careful coordination with the end user to minimise disruption

All installations were carried out using tested and approved passive fire protection systems.

Quality Assurance & Compliance

Compartmentation systems must perform as designed in the event of a fire, making correct installation and detailing critical.

Quality assurance measures included:

  • Installation in line with tested fire-rated constructions

  • Verification of fire resistance continuity

  • Attention to detailing at heads, junctions, and interfaces

  • Compliance checks to support fire safety documentation

This ensured the completed works met both regulatory and operational requirements.

Project Outcome

The completed compartmentation works allowed the warehouse to be effectively adapted, providing compliant office and welfare spaces while maintaining operational use of the wider facility.

The project delivered:

  • Compliant separation between warehouse and office areas

  • Protected escape routes for occupants

  • Compliance with Building Regulations Part B

  • A practical fire safety solution for a mixed-use environment

Commercial & Industrial Sector Experience

This project demonstrates our experience delivering passive fire protection within commercial and industrial environments, where compartmentation and operational continuity are critical.

👉 View the sectors we work in

👉 Explore our Fire Walls & Partitions services

👉 See More Case Studies

Discuss Your Project With Us

If your project involves adapting commercial or industrial premises and requires compliant passive fire protection solutions, our team is here to help.

Contact

01482 236789

Address

Unit 38, Craven Park Training and Enterprise Centre, Poorhouse Lane,
Hull, HU9 5HE

Contact Bee Fire Protection today