RNLI Tower Lifeboat Station – King George V Dock
Passive Fire Protection Within a Live Marine & Infrastructure Environment
At Bee Fire Protection Ltd, we were appointed to deliver passive fire protection works at the RNLI Tower Lifeboat Station, located at King George V Dock.
The project required compliant fire stopping measures to be installed within an operational marine environment, alongside full asset labelling and recording to support long-term fire safety management.
Project Overview
-
Client: Royal National Lifeboat Institution (RNLI)
-
Project: Tower Lifeboat Station
-
Sector: Infrastructure / Marine
-
Location: King George V Dock, Hull
-
Services Provided: Fire Stopping, Asset Labelling & Fire Asset Register
The works formed part of the building’s life-safety measures, ensuring fire compartmentation was maintained throughout wall and floor penetrations.
Project Requirements
The lifeboat station required:
-
Fire stopping to all wall and floor service penetrations
-
Installation within a live, operational marine facility
-
Clear identification and traceability of all fire stopping measures
-
Full documentation to support lifecycle fire safety management
-
Solutions suitable for a demanding infrastructure environment
Accuracy, durability, and compliance were essential due to the nature of the building and its operational use.
Challenges & Considerations
Delivering passive fire protection within a marine and dockside environment presents unique challenges.
Key considerations included:
-
Working on a structure located on the water
-
Ensuring fire stopping systems were suitable for the environment
-
Maintaining continuity of fire compartmentation
-
Providing clear identification for future inspection and maintenance
-
Ensuring installations remained accessible and auditable
The solutions needed to perform reliably over the lifecycle of the building.
Our Solution
Our team delivered a compliant fire stopping solution tailored to the operational and environmental demands of the site.
Our works included:
-
Fire stopping to all wall penetrations
-
Fire stopping to all floor penetrations
-
Installation using tested and approved fire stopping systems
-
Labelling of every penetration at the time of installation
-
Recording of product information and system details
All works were carried out with minimal disruption to operations and in line with the building’s fire strategy.
Asset Labelling & Fire Safety Records
As part of the project, every fire-stopped penetration was:
-
Clearly labelled at the point of installation
-
Logged with product and system details
-
Recorded within a fire asset register
This information remains with the building throughout its lifecycle, allowing end users to:
-
Identify the location of fire stopping measures
-
Understand what systems were installed
-
Support inspections, audits, and maintenance
-
Demonstrate ongoing fire safety compliance
Project Outcome
The completed works delivered a fully compliant passive fire protection solution tailored to a complex infrastructure environment.
The project outcome provided:
-
Maintained fire compartmentation throughout the building
-
Clear traceability of all fire stopping measures
-
Support for long-term fire safety management
-
Confidence that systems were correctly installed and documented
Infrastructure & Marine Sector Experience
This project highlights our experience delivering passive fire protection within infrastructure and marine environments, where reliability, documentation, and long-term compliance are critical.
👉 View the sectors we work in
👉 Explore our Fire Stopping services
👉 Explore our Fire Asset Inspections & Audits services
👉 See More Case Studies
Discuss Your Project With Us
If your project involves infrastructure, marine, or operational environments and requires compliant passive fire protection solutions, our team is here to help.
Address
Unit 38, Craven Park Training and Enterprise Centre, Poorhouse Lane,
Hull, HU9 5HE

